Grupo Éxito
Chiller plant renewal in three hypermarkets
Replacement of chilled-water plants in three large-format stores, focused on efficiency and continuity.
Air conditioningEnergy efficiencyDesign & consultingSupplyInstallation

The challenge
Ageing chiller plants with high consumption and failure risk during the hot season.
The solution
We engineered the replacement with higher-efficiency equipment and staged the changeover so the store stayed cooled during works.
The result
Renewed plants with lower operational risk and an efficient base for years to come.
More projects

Cámara de Comercio de Barranquilla
Cooling a heritage building
Barranquilla
View case
Cine Colombia
Phased cooling for cinema theatres
Bogotá and Chía (Titán, Centro Mayor, Andino)
View case
Grupo Éxito
HVAC for the Éxito San Diego store remodel
Medellín, Colombia
View casePlanning a similar project?
Tell us what you need to cool, refrigerate or optimize. A GreenAir engineer will reply with a technical proposal.